Search this site
Embedded Files
Skip to main content
Skip to navigation
Installation Guide
Start
Safety
What's inside?
What's not inside
Install hardware
Hardware placement
Connect Earth to the Switch
Connect wires
Install power supply
Connect to power supply
4G Antennas
Ethernet and Wi-Fi
Connect to motor (current sensors)
Connect voltage measurement
Connect voltage measurement to DAQ
Connect to power supply
Checks
Power supply check
DAQ check
Switch check
Gateway check
SAM4 setup tool
Ethernet
Wi-Fi
Mobile
Help
Linking the motor to the DAQ on the Samotics platform
Linking through the SAM4 setup tool
Linking through the Onboarding Portal
Preliminary installation validation
Installation complete
Support
Maintenance
Connectivity checks
Ethernet cable adjustment
Allow list
Installation Guide
Installation steps
2
. Connect the earth bonding point on the switch to the protective earth
Back
Next