After connecting the DAQ to the motor, you completed the installation tutorial. Now you can do a preliminary check to make sure everything has been connected properly.
1. Navigate to the “DAQs” page in the top bar
2 Click on the Motor and DAQ combination that needs to be validated
3. Turn on the motor and wait at least 1 minute
4. Refresh the page and make sure the last updated column says “Just now”
5. Turn off the motor if needed
6. Verify the values
Is the expected current visible on all three lines with the metrics called “Current RMS Channel x”?
Is the expected voltage visible on all three lines with the metrics called “voltage RMS Channel x”?
7. If one of the values is significantly off, validate the measurement with a multimeter, check the connections, and repeat the process from step 1.