Installation steps

1. Install the gateway, the switch and the DAQ on the DIN rail.

Example of a correct gateway-switch-DAQ setup

Notice Make sure the DAQ is within 3 meters of the phase wires. 

Warning Do not connect the system to the power grid during the installation.