Installation steps
1. Install the gateway, the switch and the DAQ on the DIN rail.
Example of a correct gateway-switch-DAQ setup
Notice Make sure the DAQ is within 3 meters of the phase wires.Â
Warning Do not connect the system to the power grid during the installation.